Bangladesh Limited

S.07

Engine Overhauling Services

Planned maintenance, overhaul and breakdown recovery for low- and medium-speed diesel, gas and dual-fuel engines in power plants and on ships. Multi-brand, carried out to OEM manuals, limits and torque values, and documented with measurements and photographs.

3 levels
Minor, intermediate and major overhaul
Since 2012
Rotating equipment for power and industry
24/7
Emergency breakdown support

Company

About the service

RotoTech Bangladesh Limited is an ISO 9001:2015 and ISO 45001:2018 certified engineering company in Savar, Dhaka. Since 2012 we have serviced turbochargers, turbines, motors and other rotating equipment for Bangladesh's power and industrial sectors, and we hold authorized service status for Napier and Garrett turbochargers.

Our Engine & Mechanical Services Division extends that work to the engine itself. We maintain and overhaul diesel, gas and dual-fuel engines, together with their turbochargers, alternators and auxiliary machinery, across the full maintenance cycle: routine inspection, preventive maintenance, major overhaul and emergency breakdown recovery.

What we focus on

  • Reliable operation and less unplanned downtime
  • Early detection of abnormal conditions
  • Safe work and accurate measurement
  • Correct installation, clearances, torque and alignment
  • Recommendations backed by evidence, with full technical reporting
  1. Inspect
  2. Diagnose
  3. Plan
  4. Repair
  5. Test
  6. Commission
  7. Monitor
Request a quote
Engine-generator sets in a power-plant engine hall

Target sectors

Power plants & marine

Power generation

IPP, rental and peaking plants running HFO, gas and dual-fuel engine-generator sets. We work within the plant's outage window, coordinate with O&M teams, and hand units back with trial-run records.

  • HFO and diesel power plants
  • Gas-engine and dual-fuel plants
  • EPC contractors and O&M companies
  • Industrial utility facilities

Shipping & vessels

Main propulsion engines and auxiliary generator engines on ocean-going, coastal and inland vessels. Work can be done alongside, at anchorage or during dry-dock, with records prepared for class survey where the vessel needs them.

  • Low-speed two-stroke main engines
  • Medium-speed four-stroke propulsion engines
  • Auxiliary diesel generator sets
  • Turbochargers, alternators and pumps on board
  • Voyage-repair and dry-dock overhaul packages

Multi-brand coverage

Engines in scope

MakeSpeed classTypical engine familiesApplications
WärtsiläMedium-speed, 4-strokeW20 · W26 · W32 · W34SG / DF · W46 · W50DFPower plants, propulsion, auxiliaries
MAN Energy SolutionsMedium-speed, 4-strokeL/V32/40 · L/V48/60 · L21/31 · L27/38 · L16/24 · L23/30HPower plants, propulsion, auxiliaries
MAN B&WLow-speed, 2-strokeMC / MC-C · ME / ME-CMain propulsion
Bergen EnginesMedium-speed, 4-strokeB32:40 · B35:40 · C25:33Power plants, propulsion
Other OEMsLow & medium-speedMaK · Hyundai HiMSEN · Daihatsu · Yanmar · Niigata · WinGD / SulzerMarine and land-based

Speed classes as used on this page: low-speed below 300 rpm (two-stroke crosshead), medium-speed 300–1,000 rpm (four-stroke trunk piston). Each job follows the engine maker's manual, limits and tightening values for that specific engine.

Scheduled / planned

Planned maintenance

Maintenance is carried out on running hours, following the OEM schedule for the engine, from routine checks through minor and major overhaul.

0 hCommissioning
2,000Routine
4,000Preventive
6,000Inspection
12,000 hMinor overhaul
24,000 hMajor overhaul

Running hours. Exact scope at each interval per OEM manual.

Typical activities

  • Routine engine inspection and preventive maintenance
  • Inspection and measurement of critical components
  • Replacement of worn or life-expired parts
  • Torque checks and clearance measurement
  • Performance monitoring
  • Post-maintenance testing and trial operation

Systems inspected

  • Lubricating oil
  • Fuel system
  • Exhaust
  • Cooling water
  • Starting air
  • Charge air

Major components serviced

  • Cylinder head lifted for overhaul, valve springs and rotators in place

    Fig. 01Cylinder head lifted for overhaul, valve springs and rotators in place

  • Cylinder liner: collar, sealing area and running surface

    Fig. 02Cylinder liner: collar, sealing area and running surface

  • Piston: crown, ring pack and skirt

    Fig. 03Piston: crown, ring pack and skirt

  • Connecting rod with big-end bearing bore

    Fig. 04Connecting rod with big-end bearing bore

  • Bearing shell removed for inspection

    Fig. 05Bearing shell removed for inspection

  • Fuel injection pump

    Fig. 06Fuel injection pump

  • Injection pump elements and delivery valves

    Fig. 07Injection pump elements and delivery valves

Unscheduled / unplanned

Unplanned maintenance

When an engine shows abnormal symptoms, our team inspects, troubleshoots and carries out the corrective work. The aim is to find the root cause, return the engine to service safely and keep downtime short.

  1. S01Abnormal engine noise
  2. S02High exhaust temperature
  3. S03Low lube-oil pressure
  4. S04High cooling-water temperature
  5. S05Excessive vibration
  6. S06High bearing temperature
  7. S07Starting problems
  8. S08Misfiring
  9. S09Uneven cylinder performance
  10. S10Turbocharger abnormality
  11. S11Oil or water leakage
  12. S12Exhaust-gas leakage
  13. S13Abnormal smoke
  14. S14Sudden loss of power

Breakdown & emergency

Breakdown recovery

After an accident, component failure or sudden trip, we mobilize to site and work through a fixed recovery sequence until the engine is back in safe service.

  1. 01Breakdown
  2. 02Site inspection
  3. 03Damage assessment
  4. 04Root-cause investigation
  5. 05Dismantling
  6. 06Repair / replacement
  7. 07Reassembly
  8. 08Alignment
  9. 09Testing
  10. 10Trial run
  11. 11Handover

Typical breakdown cases

  • Connecting-rod failure
  • Liner damage
  • Valve failure
  • Crankshaft problems
  • Foreign-object damage
  • Lubrication failure
  • Fire or accident damage
  • Piston damage
  • Cylinder-head failure
  • Main / big-end bearing damage
  • Turbocharger damage
  • Over-temperature events
  • Mechanical seizure
  • Component fracture

Emergency recovery stages

01RespondSite inspection and first condition assessment
02SecureControlled dismantling and damage assessment
03SolveRepair or replacement plan based on inspection and measurement
04RestoreReassembly, alignment and testing
05ReturnTrial operation and monitoring after restart

Damage assessment

  • Cylinder-head firing face with valves marked A–D for damage assessment

    Fig. 08Cylinder-head firing face with valves marked A–D for damage assessment

  • Crankpin journal: surface condition after bearing distress

    Fig. 09Crankpin journal: surface condition after bearing distress

  • Bearing bore and oil-feed holes inspected after failure

    Fig. 10Bearing bore and oil-feed holes inspected after failure

Core service

Engine overhauling

We undertake minor, intermediate and major overhauls of heavy-duty diesel, gas and dual-fuel engines. The final scope of each overhaul is set by running hours, OEM requirements and the condition found on inspection.

LevelTypical scopeMain components
MinorTop-end overhaulCylinder heads, inlet and exhaust valves, valve train, injectors, gaskets
IntermediateTop-end plus running gearPistons, rings, liners, connecting rods, big-end bearings, fuel injection pumps
MajorComplete engine overhaulMain and thrust bearings, crankshaft, camshaft, timing gear, engine block checks, lube-oil, cooling-water and starting-air systems

Overhaul in progress

  • Engine top with cylinder head removed, liner bore exposed

    Fig. 11Engine top with cylinder head removed, liner bore exposed

  • Valves withdrawn and laid out against cylinder head A4

    Fig. 12Valves withdrawn and laid out against cylinder head A4

  • Liner withdrawal in progress

    Fig. 13Liner withdrawal in progress

  • Cylinder liner lifted on hydraulic lifting tool

    Fig. 14Cylinder liner lifted on hydraulic lifting tool

  • Liner running surface: honing pattern and wear marks

    Fig. 15Liner running surface: honing pattern and wear marks

  • Outside micrometer measurement of a pin

    Fig. 16Outside micrometer measurement of a pin

  • Bore-gauge measurement of the liner

    Fig. 17Bore-gauge measurement of the liner

  • Connecting-rod shank prepared for inspection

    Fig. 18Connecting-rod shank prepared for inspection

  • Big-end housing with bearing removed

    Fig. 19Big-end housing with bearing removed

  • Crankshaft journal with measurement grid marked

    Fig. 20Crankshaft journal with measurement grid marked

  • Liner measurement at defined heights

    Fig. 21Liner measurement at defined heights

  • Crankshaft deflection reading with digital gauge

    Fig. 22Crankshaft deflection reading with digital gauge

  • Hydraulic tightening: pump pressure reading

    Fig. 23Hydraulic tightening: pump pressure reading

  • Big-end bore measured with inside micrometer

    Fig. 24Big-end bore measured with inside micrometer

  • Big-end bore measurement

    Fig. 25Big-end bore measurement

  • Valve seats cleaned and marked for measurement

    Fig. 26Valve seats cleaned and marked for measurement

  • Hydraulic jack set on bearing-cap studs

    Fig. 27Hydraulic jack set on bearing-cap studs

Component service

Cylinder heads

Inspection & measurement

  • Dismantling, visual inspection and carbon removal
  • Valve, valve-seat and valve-guide inspection
  • Valve clearance and spring checks
  • Injector inspection

Testing & reassembly

  • Pressure testing and leak checks
  • Gasket replacement
  • Reassembly
  • Torque tightening to OEM values

Cylinder-head workshop

  • Inlet and exhaust valves removed for inspection

    Fig. 28Inlet and exhaust valves removed for inspection

  • Valve-guide bore measured with dial bore gauge

    Fig. 29Valve-guide bore measured with dial bore gauge

  • Valve-stem diameter measured with micrometer

    Fig. 30Valve-stem diameter measured with micrometer

  • Valve-stem wear check

    Fig. 31Valve-stem wear check

  • Valve-seat inspection with dial gauge

    Fig. 32Valve-seat inspection with dial gauge

  • Cylinder-head ports after cleaning, head A5

    Fig. 33Cylinder-head ports after cleaning, head A5

Component service

Cylinder liners

Scope

  • Removal and installation
  • Wear measurement
  • Taper measurement
  • Honing condition
  • Seating inspection
  • Replacement advice
  • Visual inspection
  • Ovality measurement
  • Surface inspection
  • O-ring / seal renewal
  • Check against OEM limits

Liner bore is measured at set heights and in two planes (fore-aft and athwartship), so wear, ovality and taper are recorded against OEM limits for each cylinder.

  • Cylinder liner marked 4B5 after removal

    Fig. 34Cylinder liner marked 4B5 after removal

Component service

Pistons & connecting rods

Pistons

  • Removal and installation
  • Piston and piston-ring inspection
  • Ring replacement
  • Ring-groove measurement
  • Piston-pin inspection

Connecting rods

  • Connecting-rod inspection
  • Big-end bearing inspection and clearance
  • Con-rod bolt inspection
  • Hydraulic tightening to OEM values
  • Component replacement

Running gear

  • Piston and connecting-rod assembly

    Fig. 35Piston and connecting-rod assembly

  • Piston pin

    Fig. 36Piston pin

  • Piston ring check

    Fig. 37Piston ring check

  • Ring-groove clearance check

    Fig. 38Ring-groove clearance check

  • Dial-indicator set-up in the crankcase

    Fig. 39Dial-indicator set-up in the crankcase

  • Connecting rod in crankcase, bolts ready for hydraulic tightening

    Fig. 40Connecting rod in crankcase, bolts ready for hydraulic tightening

Component service

Bearings & crankshaft

Bearings covered

  • Main bearings
  • Thrust bearings
  • Turbocharger bearings
  • Auxiliary equipment
  • Big-end bearings
  • Camshaft bearings
  • Alternator bearings

Activities

  • Dismantling
  • Clearance measurement
  • Surface inspection
  • Replacement
  • Final clearance check
  • Visual inspection
  • Journal inspection
  • Wear assessment
  • Torque tightening

Bearing work

  • Big-end bore inspection

    Fig. 41Big-end bore inspection

  • Main-bearing shell after removal

    Fig. 42Main-bearing shell after removal

  • Bearing-shell thickness check with vernier

    Fig. 43Bearing-shell thickness check with vernier

  • Hydraulic tensioning pressure check

    Fig. 44Hydraulic tensioning pressure check

  • Big-end measurement on the workshop stand

    Fig. 45Big-end measurement on the workshop stand

  • Main-bearing cap lifting fixture inside the engine

    Fig. 46Main-bearing cap lifting fixture inside the engine

Generator side

Alternators & alignment

Mechanical services

  • Alternator bearing inspection and replacement
  • Shaft and coupling inspection
  • Vibration-related mechanical inspection
  • Trial run and performance observation

Alignment

  • Engine-generator alignment
  • Generator alignment
  • Soft-foot checking
  • Coupling condition checks
  • Laser shaft alignment to 0.01 mm

Alternators

  • Engine-generator sets in a power-plant engine hall

    Fig. 47Engine-generator sets in a power-plant engine hall

  • Coupling alignment between engine and alternator

    Fig. 48Coupling alignment between engine and alternator

  • Alternator sleeve-bearing shell

    Fig. 49Alternator sleeve-bearing shell

  • Alternator DE bearing end shield

    Fig. 50Alternator DE bearing end shield

  • Alternator shaft journal

    Fig. 51Alternator shaft journal

  • Bearing housing on alternator shaft

    Fig. 52Bearing housing on alternator shaft

  • Alternator rotor removed for inspection

    Fig. 53Alternator rotor removed for inspection

  • Stator winding inspection

    Fig. 54Stator winding inspection

Engineering support

Failure investigation

After a major failure we investigate the probable cause and issue a Failure Investigation / Inspection Report to the customer. The investigation follows these steps:

  1. 01Site condition assessment
  2. 02Operating-data review
  3. 03Visual inspection
  4. 04Component dismantling
  5. 05Damage documentation
  6. 06Dimensional measurement
  7. 07Photographic record
  8. 08Component condition assessment
  9. 09Possible failure mechanism
  10. 10Root-cause discussion
  11. 11Corrective action
  12. 12Preventive recommendation

In-house strength

Turbochargers & workshop

Turbochargers are where RotoTech started. Engine customers get the same specialist team for turbocharger inspection, overhaul and rotor balancing, so the engine and its turbocharger are handled under one contract.

  1. Napier · authorized
  2. Garrett · authorized
  3. ABB
  4. MAN
  5. KBB
  6. Other industrial

Workshop · Savar, Dhaka

01BalancingDynamic balancing up to 5,000 kg, to ISO 1940
02AlignmentLaser shaft alignment to 0.01 mm
03BearingsWhite-metal bearing refurbishment
04MachiningCNC machining and vibration analysis
05HoursWorkshop operates 24/7

At a glance

Capability matrix

Maintenance regimes

  • Scheduled
  • Planned
  • Preventive
  • Unscheduled
  • Unplanned
  • Breakdown
  • Emergency recovery

Engine components

  • Engine overhauling
  • Cylinder head
  • Cylinder liner
  • Piston & rings
  • Connecting rod
  • Big-end bearing
  • Main bearing
  • Thrust bearing

Associated equipment

  • Turbocharger service
  • Alternator bearing
  • Engine-generator alignment
  • Pumps & motors

Assessment & reporting

  • Engine health check
  • Condition assessment
  • Failure investigation
  • Trial run & commissioning
  • Technical inspection report

Track record

Reference sites

  • 100 MW · HFO

    BPDB, Chapainawabganj Power Plant

    Turbocharger inspection, cleaning, component assessment, nozzle-ring inspection and related technical support.

  • 50 MW · Peaking

    BPDB, Titas Peaking Power Plant, Cumilla

    ABB TPL67 turbocharger inspection after a high exhaust-temperature and cylinder-valve failure event, with damage assessment and component inspection.

  • 110 MW · HFO

    CPRL Power Plant, Rangpur

    Maintenance of alternator LSA 58 110-8P-L4; alignment and bearing inspection after high temperature; servicing, installation and commissioning support.

  • 105 MW · HFO

    Orion Power Rupsha Limited

    Turbocharger inspection, mechanical troubleshooting, bearing work, alignment and breakdown support.

  • 200 MW · HFO

    Desh Energy Chandpur Power Company Limited

    Turbocharger inspection, mechanical troubleshooting, bearing work, alignment and breakdown support.

  • Industrial

    API Industrial Park Services Limited, CETP Project

    Pre-commissioning inspection and condition assessment of pumps and motors, with maintenance, alignment, testing and commissioning support.

  • Various

    Other power plants & industrial facilities

    Engine maintenance, turbocharger inspection, mechanical troubleshooting, bearing work, alignment and breakdown support.

  1. BPDB
  2. RPCL
  3. Summit Power
  4. United Group
  5. Orion Group
  6. Desh Energy
  7. KPCL
  8. BR Powergen
  9. BCIC
  10. Sulzer

Method

Working approach

UnderstandThe equipment problem, its operating history and what the customer needs.
InspectVisual inspection, measurement and technical assessment.
DiagnoseProbable cause and present condition of the equipment.
PlanMaintenance or recovery plan with manpower, tools and spare parts.
ExecuteDismantling, repair, replacement, assembly and alignment.
TestChecks, trial operation and performance observation.
ReportFindings, measurements, photographs and recommendations.

Deliverables

Service documentation

Depending on scope, the final documentation package can include:

  • Service report
  • Health-check report
  • Dimensional measurement report
  • Before / after photographs
  • Final service completion report
  • Inspection report
  • Breakdown investigation report
  • Alignment report
  • Spare-parts recommendation
  • Maintenance report
  • Component inspection report
  • Turbocharger inspection report
  • Maintenance recommendation

Differentiators

Why RotoTech

01Experienced teamHands-on experience maintaining power-generation and industrial machinery.
02Complete supportFrom routine maintenance to major overhaul and emergency breakdown recovery.
03Breakdown recoveryTechnical support for unexpected failures and equipment damage, 24/7.
04Multi-disciplineEngine, turbocharger, generator, bearings, alignment and associated machinery under one contract.
05Technical reportingInspection records, measurements and photographic documentation for every job.
06Certified systemsISO 9001:2015 quality and ISO 45001:2018 occupational health and safety management.

FAQ

Frequently Asked Questions

Which engines do you work on?

Planned maintenance, overhaul and breakdown recovery for low- and medium-speed diesel, gas and dual-fuel engines in power plants and on ships. Multi-brand, carried out to OEM manuals, limits and torque values, and documented with measurements and photographs.

  • Wärtsilä
  • MAN Energy Solutions
  • MAN B&W
  • Bergen Engines
  • MaK · Hyundai HiMSEN · Daihatsu · Yanmar · Niigata · WinGD / Sulzer

When is an engine overhauled?

Maintenance is carried out on running hours, following the OEM schedule for the engine, from routine checks through minor and major overhaul.

The final scope of each overhaul is set by running hours, OEM requirements and the condition found on inspection.

What do minor, intermediate and major overhauls include?

  • Minor: Top-end overhaul — Cylinder heads, inlet and exhaust valves, valve train, injectors, gaskets
  • Intermediate: Top-end plus running gear — Pistons, rings, liners, connecting rods, big-end bearings, fuel injection pumps
  • Major: Complete engine overhaul — Main and thrust bearings, crankshaft, camshaft, timing gear, engine block checks, lube-oil, cooling-water and starting-air systems

Can you work on board ships?

Main propulsion engines and auxiliary generator engines on ocean-going, coastal and inland vessels. Work can be done alongside, at anchorage or during dry-dock, with records prepared for class survey where the vessel needs them.

What happens after a breakdown?

After an accident, component failure or sudden trip, we mobilize to site and work through a fixed recovery sequence until the engine is back in safe service.

  • Respond: Site inspection and first condition assessment
  • Secure: Controlled dismantling and damage assessment
  • Solve: Repair or replacement plan based on inspection and measurement
  • Restore: Reassembly, alignment and testing
  • Return: Trial operation and monitoring after restart

What documentation do we receive?

Depending on scope, the final documentation package can include:

  • Service report
  • Health-check report
  • Dimensional measurement report
  • Before / after photographs
  • Final service completion report
  • Inspection report
  • Breakdown investigation report
  • Alignment report
  • Spare-parts recommendation
  • Maintenance report
  • Component inspection report
  • Turbocharger inspection report
  • Maintenance recommendation
More frequently asked questions

24/7 Emergency Support — +880 1730-067280

Call Us

Keeping your engine running.
Keeping your plant producing.

We aim to be a long-term technical service partner for: Power plants · Ship owners & managers · Gas-engine plants · Diesel power plants · Industrial facilities · EPC contractors · O&M companies.

Credentials & Partnerships

Napier AuthorizedVVK TurboTechGarrett MotionJAKATGShakti TurbineiMAKEM Services (India) Private Limited