Bangladesh Limited

Mechanical Projects

Mechanical Project Execution

Full mechanical project capability from structural fabrication to precision equipment installation. Piping systems, rotating machinery installation, alignment, commissioning and load testing.

6
Services, installation to commissioning
Vibration
and temperature, monitored in commissioning
24/7
Emergency support

Overview

Installation, piping and commissioning

Beyond routine repair, RotoTech is a capable project execution partner — from new installations to exact replication of existing systems and full plant expansions.

    Request a quote

    Commissioning

    Commissioning & Testing

    Commissioning & TestingCommissioning & Testing

    RotoTech Bangladesh supports mechanical commissioning and testing activities to help verify that installed equipment and systems are ready for operation. These activities may include checking installation quality, inspecting mechanical connections, verifying shaft alignment, monitoring vibration and temperature and conducting functional tests. Where required, performance testing can help assess equipment operation against specified requirements. The scope of testing depends on the equipment type, project specifications, and agreed commissioning procedures.

    Activities may include

    1. Checking installation quality
    2. Inspecting mechanical connections
    3. Verifying shaft alignment
    4. Monitoring vibration and temperature
    5. Conducting functional tests

    Installation

    Equipment Installation

    Equipment Installation

    RotoTech Bangladesh provides a point of contact for industrial equipment installation projects involving the positioning, mounting, alignment, and connection of mechanical machinery. Installation activities may include checking foundations and base frames, levelling equipment, securing anchor bolts, aligning rotating components, and coordinating connections with piping and drive systems. Proper installation practices help reduce mechanical stress, support stable operation, and prepare equipment for commissioning according to manufacturer recommendations and project requirements.

    Installation activities may include

    1. Checking foundations and base frames
    2. Levelling equipment
    3. Securing anchor bolts
    4. Aligning rotating components
    5. Coordinating connections with piping and drive systems

    Piping & flanging

    Piping & Flanging

    Piping & Flanging

    Industrial piping and flanging work support the movement of liquids, gases, steam, and other process fluids between equipment and plant systems. Activities may include pipe measurement, cutting, fitting, flange alignment, gasket installation, bolted-joint assembly, and welding where applicable. Proper pipe support, connection alignment, and joint assembly help minimize unwanted mechanical loads and leakage risks. Inspection and pressure testing should be performed according to the project scope, applicable standards, and approved procedures.

    Activities may include

    1. Pipe measurement
    2. Cutting
    3. Fitting
    4. Flange alignment
    5. Gasket installation
    6. Bolted-joint assembly
    7. Welding where applicable

    Pump & compressor

    Pump & Compressor Sets

    Pump & Compressor Sets

    Pump and compressor installation involves positioning and integrating rotating equipment with its motor, drive system, piping, and supporting components. Depending on the project, activities may include base-frame inspection, foundation checks, coupling alignment, suction and discharge connection verification, and inspection of lubrication or cooling arrangements. Correct alignment and suitable piping connections help reduce unwanted mechanical loads, vibration, and premature component wear. Commissioning checks should follow the equipment manufacturer's recommendations and the agreed project requirements.

    Activities may include

    1. Base-frame inspection
    2. Foundation checks
    3. Coupling alignment
    4. Suction and discharge connection verification
    5. Inspection of lubrication or cooling arrangements

    Fabrication

    Structural Fabrication

    Structural Fabrication

    Structural fabrication involves manufacturing steel structures and mechanical support for industrial equipment and facilities. Depending on the project, work may include cutting, drilling, welding, fitting, and assembling support frames, equipment bases, platforms, brackets, and access structures. Fabrication is carried out according to approved drawings, specified dimensions, material requirements, and site conditions. Dimensional checks and appropriate weld inspections help verify fabrication quality and ensure that the finished structure is suitable for its intended installation.

    Assembling

    1. Support frames
    2. Equipment bases
    3. Platforms
    4. Brackets
    5. Access structures

    Turbine

    Turbine Installation

    Turbine Installation

    Turbine installation requires careful equipment positioning, foundation preparation, levelling, and precision alignment of connected rotating components. Depending on the turbine type and project scope, installation activities may also involve coupling alignment, inspection of auxiliary piping, lubrication-system checks, and coordination with associated equipment. Proper installation is essential because alignment errors, unsuitable foundation conditions, or incorrect connections can affect vibration, bearing loads, and operating reliability. All work should follow manufacturer procedures, approved technical documentation, and applicable safety requirements.

    Installation activities may also involve

    1. Coupling alignment
    2. Inspection of auxiliary piping
    3. Lubrication-system checks
    4. Coordination with associated equipment

    FAQ

    Frequently Asked Questions

    What mechanical project services does RotoTech provide?

    • Commissioning & Testing
    • Equipment Installation
    • Piping & Flanging
    • Pump & Compressor Sets
    • Structural Fabrication
    • Turbine Installation

    Does RotoTech support commissioning and testing?

    RotoTech Bangladesh supports mechanical commissioning and testing activities to help verify that installed equipment and systems are ready for operation. The scope of testing depends on the equipment type, project specifications, and agreed commissioning procedures.

    Why is careful turbine installation important?

    Proper installation is essential because alignment errors, unsuitable foundation conditions, or incorrect connections can affect vibration, bearing loads, and operating reliability. All work should follow manufacturer procedures, approved technical documentation, and applicable safety requirements.

    More frequently asked questions

    Projects

    Electrical & Mechanical Project Capability

    24/7 Emergency Support — +880 1730-067280

    Call Us

    Ready to Solve Your
    Machinery Challenge?

    Fast, no-obligation quote from our engineering team — services or projects

    Credentials & Partnerships

    Napier AuthorizedVVK TurboTechGarrett MotionJAKATGShakti TurbineiMAKEM Services (India) Private Limited